国产精品国产三级国产a,少妇特黄一区二区三区,精品人妻一区二区三,国产精品国产三级国产aⅴ中文

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

濟(jì)南通風(fēng)管道加工有哪些常見問題?

來源:http://888qp03.com/     發(fā)布時間:2023-06-19  

1、管道傾斜角度和彎頭角度不正確
1. Incorrect inclination angle of pipeline and elbow angle
性能:折疊角不平直;矩形風(fēng)管的兩個相對平面與兩端不平行;咬人不嚴(yán)格;對角線不相等。
Performance: The folding angle is not straight; The two opposite planes of a rectangular duct are not parallel to both ends; Not strict in biting people; Diagonal lines are not equal.
原因:管道成對平行,相對板的長度和寬度不相等;板材下料放樣設(shè)置的不正確。
Reason: The pipes are parallel in pairs, and the length and width of the relative plates are not equal; The setting of sheet cutting and layout is incorrect.
影響:會在通風(fēng)管道上造成不均勻的力,安裝的管道不平直,法蘭墊圈不牢固,并且系統(tǒng)泄漏,從而導(dǎo)致空調(diào)負(fù)荷損失,導(dǎo)致使用壽命縮短。
Impact: It can cause uneven force on the ventilation duct, uneven installation of the duct, unstable flange gaskets, and system leakage, resulting in loss of air conditioning load and shortened service life.
措施:展開和下料時,應(yīng)嚴(yán)格限制板材的直角,將板材的長度,寬度和檢查對角線控制在允許范圍內(nèi);落料后,管道相對部分的兩塊板應(yīng)重疊以檢查尺寸精度。
Measures: When unfolding and cutting, the right angles of the board should be strictly restricted, and the length, width, and inspection diagonal of the board should be controlled within the allowable range; After blanking, the two plates in the opposite part of the pipeline should overlap to check the dimensional accuracy.
濟(jì)南通風(fēng)管道加工
2、管道加工材料不符合標(biāo)準(zhǔn)
2. Pipeline processing materials do not meet the standards
性能:管道表面下沉,側(cè)面向外突出,變形明顯;板的表面不平整,厚度不均勻,有明顯的壓痕,裂紋,砂眼,疤痕和生銹。
Performance: The surface of the pipeline sinks, the side protrudes outward, and the deformation is obvious; The surface of the board is uneven, with uneven thickness, obvious indentations, cracks, sand holes, scars, and rust.
原因:該材料不合格,不能滿足制造風(fēng)管的要求。
Reason: The material is not qualified and cannot meet the requirements for manufacturing air ducts.
影響:操作期間風(fēng)管泄漏,空調(diào)負(fù)荷增加以及風(fēng)管壽命和性能受到影響。
Impact: During operation, the air duct leaks, the air conditioning load increases, and the lifespan and performance of the air duct are affected.
措施:在制造管道之前,有必要檢查材料出廠合格證書,材料合格證書,外觀厚度等,以確保材料可用。
Measures: Before manufacturing pipelines, it is necessary to check the material factory certificate, material qualification certificate, appearance thickness, etc. to ensure that the materials are usable.

上一篇:濟(jì)南通風(fēng)管道施工時設(shè)備吊架要遵守哪些標(biāo)準(zhǔn)?
下一篇:通風(fēng)管道加工焊接注意事項

九九九久久久精品| 国产精品污网站| 日韩精品高清在线| 欧美日韩一区二区久久| 99久久免费精品| jizz亚洲| 欧美日韩一区二区三区| 天天爽爽| 日韩欧美国产中文字幕| 欧美一区二区三区影视| 日韩欧美高潮| 精品毛片一区二区三区| 中文字幕22页| 欧美人与禽zoz0性论交| 老熟女老熟女精品视频性色| 亚洲男人的av天堂| 男人的嘴女人下身视频| 日韩精品激情| 亚洲精品久久久蜜桃| 久久影院亚洲| 国产麻豆黄色片| 欧美午夜三级视频| 91在线在线啪永久地址| 男人操女人下面的视频| 国产一线二线三线女| 5678影院午夜理论片| xxxnxxx国产| 亚洲国产精品嫩草影院久久av| 91欧美成人一区二区三区| 大地资源网第二页| 国产精品18久久久久久久| 女人被爽到高潮呻吟的说说| a级片免费在线播放| 成人在线观看中文字幕| 成人久久一区| 欧美性受xxxx黑人xyx性爽☆| 亚洲一区二区三区免费看| 天堂最新资源在线| 欧美精品99久久久啪啪| 麻豆精品在线免费观看| 凹凸视频精品一区二区|